3GPP Scout / Meetings / RAN4 #121

RAN4 #121Final

RAN4 #121: what was agreed

16 November to 20 November 2026Calgary3GPP TSG RAN WG4Last updated 2026-11-21

At a glance

  1. High-power UAV maximum output power and RF emissions draft CRs were endorsed, not agreed.

    Sources: R4-2631109, ZTE (Draft CR. Register status: endorsed at R4-121.); R4-2631485, Qualcomm (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © ZTE, Qualcomm.

  2. A pCR on IBB and maximum input level was approved as non-normative text for TR 38.767.

    Source: R4-2631345, Ericsson (pCR. Register status: approved at R4-121.). 3GPP TSG RAN WG4 #121. © Ericsson.

  3. Noted FR1 ground-truth proposals covered TE-set test values and reported measurements as a simulation benchmark.

    Sources: R4-2631479, Ericsson (Proposal 12, paragraph 61); R4-2631204, OPPO (Proposal 17, paragraph 72). 3GPP TSG RAN WG4 #121. © Ericsson, OPPO.

TDocs registered
2,828
Decisions read
7
Agreements explained
4
Points still open
3

Your topic

Follow a topic and get its next outcome by email.

Scout emails you when a new agreement or decision on it is recorded, with the source for each. Or ask Scout and get an answer that cites the exact TDoc. Free to start.

Another topic or company? Follow it

What was agreed

Agenda itemTopicTDocsAgreed hereStill open
7.7.4UE RF requirementsn/a32
7.15.3RRM measurement prediction (UE sided model)2600
7.8.3UE RF requirementsn/a11
7.6.5.1UE RF requirementsn/a00
7.6.6.1.1UE RF requirementsn/a00
7.6.6.2.1UE RF requirementsn/a00
Figure 1. The agenda items this page covers. TDocs counts every document registered under the item. Agreed here and Still open count the points this page explains.

7.7.4UE RF requirements

Draft CR endorsed (not yet an agreed CR)

High-power UAV RF draft CRs

Draft CRs on high-power UAV maximum output power and output RF spectrum emissions were endorsed, not agreed.

Sources: R4-2631109, ZTE (Draft CR. Register status: endorsed at R4-121.); R4-2631485, Qualcomm (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © ZTE, Qualcomm.

Draft CR endorsed (not yet an agreed CR)

Aerial UE and UAV transmitter draft CRs

Draft CRs on aerial UE transmit signal quality and general UAV transmitter characteristics were endorsed, not agreed.

Sources: R4-2630712, CATT (Draft CR. Register status: endorsed at R4-121.); R4-2630774, China Mobile (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © CATT, China Mobile.

pCR approved (text for the study TR, not normative)

TR 38.767 receiver text

A pCR on IBB and maximum input level was approved as text for TR 38.767. The text is not normative.

Source: R4-2631345, Ericsson (pCR. Register status: approved at R4-121.). 3GPP TSG RAN WG4 #121. © Ericsson.

7.8.3UE RF requirements

CR endorsed (not yet agreed)

LB CA via switching

A CR to introduce R20 LB CA via switching in TR 38.768 was endorsed, not agreed.

Source: R4-2631522, CATT (CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © CATT.

Who pushed what

7.15.3RRM measurement prediction (UE sided model)

Proposed

What should provide FR1 ground truth for measurement prediction?

Ericsson proposes TE-set values for tests, while OPPO proposes reported values for simulation. Huawei and HiSilicon propose reported values but flag UE-cheating avoidance.

EricssonOPPOHuawei (with HiSilicon)

Compare the 4 proposals
CompanyWhat they proposeSource
EricssonEricsson proposes TE-set values for FR1 ground truth, following Rel-15 non-AI/ML accuracy requirements.
Their words
For AI/ML-based mobility in FR1, RAN4 should use the value set by the test equipment (TE) as ground-truth for predicted RRM measurements, following the Rel-15 [...]
R4-2631479Proposal 12, paragraph 61 · register: noted
OPPOOPPO proposes reported measurements as the FR1 simulation benchmark, including measurement error.
Their words
Use Alt2 (i.e., reported measurement value under certain conditions) to define the ground truth for prediction accuracy in FR1, i.e., use the measurement with error [...]
R4-2631204Proposal 17, paragraph 72 · register: noted
Huawei (with HiSilicon)Huawei and HiSilicon identify an unknown UE prediction time as an obstacle to TE-based ground truth.
Their words
If the ground truth in FR1 is defined based on the TE transmitted or reception power (Alter 1), the following aspects are obstacles: The specific [...]
R4-2631166Proposal 9, paragraph 67 · register: noted
Huawei (with HiSilicon)Huawei and HiSilicon propose reported values and say UE-cheating avoidance can await R19 test progress.R4-2631166Proposal 10, paragraph 72 · register: noted

7.6.5.1UE RF requirements

Proposed

Which SNR targets should guide VSAT RF requirements?

Xiaomi proposes a -1 dB target SNR for EIS derivation and a -6 dB link-budget feasibility study. Huawei and HiSilicon distinguish the UL and DL effects of targets below -1 dB.

XiaomiHuawei (with HiSilicon)

Compare the 2 proposals
CompanyWhat they proposeSource
XiaomiXiaomi proposes -1 dB for EIS derivation and studying -6 dB link-budget feasibility for both links.
Their words
RAN4 to confirm that the target SNR of -1 dB is used for EIS requirement derivation, and to study the feasibility of link budget at [...]
R4-2631596Proposal 1, paragraph 11 · register: noted
Huawei (with HiSilicon)Huawei and HiSilicon distinguish UL transmit relaxation from tighter DL receiver sensitivity below -1 dB.
Their words
A target UL SNR below -1 dB relaxes UE transmit requirements, while a target DL SNR below -1 dB tightens UE downlink receiver sensitivity requirements.
R4-2630960Observation 1, paragraph 19 · register: noted

7.15.3RRM measurement prediction (UE sided model)

Proposed

How should inter-frequency prediction interact with measurement gaps?

Apple points to existing TS 38.133 applicability conditions for an input MO. MediaTek asks whether Case 2.4 is in scope before assessing L1 measurement impact within gaps.

AppleMediaTek

Compare the 2 proposals
CompanyWhat they proposeSource
AppleApple says existing applicability conditions determine gap, no-gap or NCSG requirements for the input MO.
Their words
Observation 1: The MO used as input for inter-frequency prediction is configured as a legacy measObject. [...]
R4-2630500Observation 1, paragraph 20 · register: noted
MediaTekMediaTek asks if Case 2.4 is in scope before discussing L1-RSRP measurement impact within MG.
Their words
Proposal 5: Discuss whether this case is considered or not before discussing the impact on L1 measurement within gap: Case 2.4: Use a MO to [...]
R4-2630228Proposal 5, paragraph 49 · register: noted

Proposed

How should inter-frequency prediction accuracy be evaluated?

China Mobile proposes relative accuracy requirements for frequency prediction. Apple identifies a ground-truth limit for undetectable cells, while Lekha Wireless Solutions proposes a comparison instant.

China MobileAppleLekha Wireless Solutions

Compare the 3 proposals
CompanyWhat they proposeSource
China MobileChina Mobile proposes relative accuracy requirements for frequency prediction.
Their words
it is proposed to define relative accuracy requirements for frequency prediction.
R4-2630798Proposal 6, paragraph 35 · register: noted
AppleApple observes that no ground truth is available when a predicted cell is undetectable during the monitoring window.R4-2630500Observation 9, paragraph 108 · register: noted
Lekha Wireless SolutionsLekha Wireless Solutions proposes comparison at the instant of the latest source-frequency measurement used for prediction.
Their words
The predicted target-frequency L3-RSRP is evaluated against the ground truth L3-RSRP at the same time instant, i.e., the instant of the latest source-frequency measurement used [...]
R4-2630396Proposal 10, paragraph 47 · register: noted

Company contributions to 3GPP TSG RAN WG4 #121. Each TDoc is © the company named in its row. These are proposals, not decisions.

Still open

Still open

  • The high-power UAV maximum output power and RF emissions draft CRs remain endorsed, not agreed.

    Sources: R4-2631109, ZTE (Draft CR. Register status: endorsed at R4-121.); R4-2631485, Qualcomm (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © ZTE, Qualcomm.

  • The aerial UE transmit signal quality and general UAV transmitter draft CRs remain endorsed, not agreed.

    Sources: R4-2630712, CATT (Draft CR. Register status: endorsed at R4-121.); R4-2630774, China Mobile (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © CATT, China Mobile.

  • The LB CA via switching CR for TR 38.768 remains endorsed, not agreed.

    Source: R4-2631522, CATT (CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © CATT.

What to watch next meeting

  • Watch whether the endorsed high-power UAV maximum output power and RF emissions draft CRs advance to agreed CRs.

    Sources: R4-2631109, ZTE (Draft CR. Register status: endorsed at R4-121.); R4-2631485, Qualcomm (Draft CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © ZTE, Qualcomm.

  • Watch whether FR1 ground-truth proposals for testing and simulation gain a recorded decision.

    Sources: R4-2631479, Ericsson (Proposal 12, paragraph 61); R4-2631204, OPPO (Proposal 17, paragraph 72). 3GPP TSG RAN WG4 #121. © Ericsson, OPPO.

  • Watch whether the LB CA via switching CR advances beyond endorsement.

    Source: R4-2631522, CATT (CR. Register status: endorsed at R4-121.). 3GPP TSG RAN WG4 #121. © CATT.

Sources

All 15 TDocs cited
  • R4-2631109 Draft CR to TS38.101-1 on maximum output power for high power UAV. ZTE (with Sanechips). Draft CR. Register status: endorsed at R4-121.
  • R4-2631485 Draft CR to TS38.101-1 for adding Output RF spectrum emissions for UAV HPUE. Qualcomm. Draft CR. Register status: endorsed at R4-121.
  • R4-2631345 TP for TR 38.767 Rx requirements on IBB and maximum input level. Ericsson (with Huawei). pCR. Register status: approved at R4-121.
  • R4-2631479 RRM measurement prediction for AIML mobility. Ericsson. Contribution. Register status: noted at R4-121.
  • R4-2631204 Discussion on RAN4 requirements for RRM measurement prediction. OPPO. Contribution. Register status: noted at R4-121.
  • R4-2630712 Draft CR to TS 38.101-1 on Transmit signal quality for Aerial UE. CATT. Draft CR. Register status: endorsed at R4-121.
  • R4-2630774 Draft CR to TS 38.101-1 on general part of UAV Transmitter characteristics. China Mobile. Draft CR. Register status: endorsed at R4-121.
  • R4-2631522 CR for TR 38.768 to introduce R20 LB CA via switching. CATT. CR. Register status: endorsed at R4-121.
  • R4-2631166 Discussion on impacts for RRM measurement prediction. Huawei (with HiSilicon). Contribution. Register status: noted at R4-121.
  • R4-2631596 Discussion on HD-FDD VSAT RF requirements for Ku band and Ka band with FR2 numerology. Xiaomi. Contribution. Register status: noted at R4-121.
  • R4-2630960 Discussion on HD-FDD for Ku band and Ka band with FR2 numerology. Huawei (with HiSilicon). Contribution. Register status: noted at R4-121.
  • R4-2630500 Discussion on RRM requirements for AI/ML mobility. Apple. Contribution. Register status: noted at R4-121.
  • R4-2630228 Discussion on RRM measurement prediction. MediaTek. Contribution. Register status: noted at R4-121.
  • R4-2630798 Discussion on RRM measurement prediction. China Mobile. Contribution. Register status: noted at R4-121.
  • R4-2630396 Discussion on RRM measurement prediction requirements for AI/ML Mobility. Lekha Wireless Solutions. Contribution. Register status: noted at R4-121.

Coverage: RAN4 #121 (Calgary, 2026-11-16 to 2026-11-20), agenda items 7.7.4, 7.15.3, 7.8.3, 7.6.5.1, 7.6.6.1.1, 7.6.6.2.1.

What this page read and what it leaves out

Scout read 7 recorded decisions and 24 company positions or contribution passages on these agenda items (catalog synced 2026-11-20) and cites 6 decisions and 11 positions from 15 TDocs. Every quoted passage was matched verbatim against the TDoc text; the summaries around the quotes are Scout's reading. Register statuses are copied from the 3GPP TDoc register: not treated means a document was not handled on its own, though its content may have fed feature-lead summaries or merged revisions. Not covered: other agenda items and meetings, plenary TDocs and plenary decisions after the meeting, email discussions after the meeting, and anything not yet in the chair notes or register.

The provided records contain no decision establishing UE-sided RRM prediction ground truth or measurement-gap treatment.

CSSF counting has a noted company proposal but no recorded outcome in the provided evidence.

CATT's handover-delay draft CR was not pursued. Its register entry gives no reason.

Next outcome

Get the RAN4 #122 outcome by email.

Scout emails you when RAN4 records a new agreement or decision, with the source for each. Free to start.

Built by 3GPP Scout from the public meeting record (2828 TDocs registered, catalog synced 2026-11-20). Significance scores compare each topic's activity at this meeting with the group's topics over the past 12 months. Excerpts are at most 25 words and link to the original on the 3GPP file server.